sampedlar06 Posted January 26, 2010 Report Posted January 26, 2010 Hi Guys, Im just about to finish a driveway and i need to put the kiln dried sand on and whak it down. I have told the customer it has to be dry before i do this but why? He has started to give me greif because he wants it finished but i cant give him an answer to why i cant do it other than it has to be dry. so why does it have to be dry before i put the sand down? Thanks in advance Sam
SmokeEm Posted January 26, 2010 Report Posted January 26, 2010 Ohterwise the kiln dried sand will absorb the moisture & not sink in and lock together the blocks.
sampedlar06 Posted January 26, 2010 Author Report Posted January 26, 2010 lovely thanks alot smokeEm. how was the dinner last night ?!
sampedlar06 Posted January 26, 2010 Author Report Posted January 26, 2010 haha great! just spoke to the bloke and he is happier now fingers crossed it will be dry tomorrow so i can get it done. cos business is BOOOMING! lol
Mr Sam Posted January 26, 2010 Report Posted January 26, 2010 as said kiln dried sand is very fine and sucks up the moisture very quickly, imagine a childs sandpit when the sands all wet and soggy, now try get that sand down between the blocks...........waste of time we tip the sand out bag at a time one of us sweeps it around and the other goes over it with the wacker plate this rattles the blocks around untill the crack fill up with the sand hope it drys up soon for you trying to point up some brickwork today has been a chuffin nightmare bricks soppin went so the compo just wont set
sampedlar06 Posted January 26, 2010 Author Report Posted January 26, 2010 as said kiln dried sand is very fine and sucks up the moisture very quickly, imagine a childs sandpit when the sands all wet and soggy, now try get that sand down between the blocks...........waste of time we tip the sand out bag at a time one of us sweeps it around and the other goes over it with the wacker plate this rattles the blocks around untill the crack fill up with the sand hope it drys up soon for you trying to point up some brickwork today has been a chuffin nightmare bricks soppin went so the compo just wont set cooor i hate pointing at the best of times but in the wet and it fookin freezing at the moment aswell oh well atleast we are working
Mr Sam Posted January 26, 2010 Report Posted January 26, 2010 doing a garage conversion though so soon have the windows in and be working inside although im actually a landscaper, well i think i am after working for this company nearly a year ive just been given a contract to sign
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now