Bead spreader out, then use a wide flat blade screwdriver and tuck the inside of the rubber under the lip of the screen surround a little bit at a time start in one corner and work along. Use your whole hand flat on the glass and push out
2 90 deg full flow an6 https://www.ebay.co.uk/itm/AN-6-JIC-BLACK-90-Degree-FULL-FLOW-Elbow-FEMALE-COUPLER-Oil-Hose-Fitting-Adapter/272610758092?hash=item3f78de0dcc:g:GjUAAOSwSlBY3FH6
1 an6 male/ male join
1 filter fitting
1 pump fitting
used an10 on the pump inlet
Gearbox should sit where it is now with the correct mounts
you can buy a simple alloy cradle that holds filter and pump together I’ll find some pics what I’ve done before
Thanks for the responses, it was full grp 1 spec, so baby atlas, rocket box, Bilsteins, wcxm, twin 44 idfs, parts wise I’m not far away! Just need to get welding!