Jump to content

Recommended Posts

Posted

So with the short evenigs fast approaching what are your winter plans for your OSF?

 

i found some small bubbles on my rear arch and on the c pillar so i might have the 1/4 replaced

 

and

 

i wann hook the engine out and do a bit of tidying in the engine bay.

 

and maybe a new set of wheels

 

how about guys?

Posted

when i get the money im going to have 2 new wings fitted, front panel fitted, rear drivers wheel arch fitted and possibly a full repsray depending on cash.

 

also lower it 1.5 inches and maybe a quickshift kit if i can afford it.

Posted

 

i found some small bubbles on my rear arch and on the c pillar so i might have the 1/4 replaced

 

?

 

a new quarter panel for some rust bubbles :shock:

 

im spending nothin more on ours, maybe some new rear tyres as the snow and ice come il still be driving hard, we dont whimp out up north :P

Posted

Stripping my Escort down properly now I have somewhere to do it;

 

Get rid of all the surface rust, some on every panel, will take a while to do, the door bottoms need to be repaired, need to sort the hole under the fuel tank, and the C post, hopefully save up to get it sprayed or I might have a go myself :?

 

The Cortina needs tie bar bushes so I feel a set of poly bushes coming up, I'll also wirebrush out under the arches and re underseal them to stop the salt getting at the steel......

 

Quite looking forward to getting stuck in :D

Posted

oh winter time :( ...what fun...im defentaily not pulling my engine out again in winter time outside...prob just do things has i come across them (smaller items) ...still got things to finsh of what ive already started to do..but been givin my sister moggy to reweld and fix so trying to get that done b4 winter really kicks in

Posted

Quite a bit hopefully if money and weather allows. Things cost so much now and I don't have a garage so I work outside with a thick coat, hot mug of tea and a gazebo if it is raining.

 

Paint inside floor, replace all bushes with poly ones, all hoses replace with blue samco ones, tidy and paint engine bay, do a round head lamp conversion, fit quarter bumpers and cibies, spray underside of bonnet and do a mass sealant on the underside.

 

Shit man, looking at that list I am going to be bloody busy. Plan is to start Nov 1st and have done by 1st March.

Posted

Fit my T5 gearbox, cossie clutch and flywheel, wip out the engine change the sump and fit some heavy duty engine mounts, fit a full cage (if I can find one!) and maybe some fibre glass doors. Thats November sorted, then in December......................................!! (Joking :D !)

Posted
Quite a bit hopefully if money and weather allows. Things cost so much now and I don't have a garage so I work outside with a thick coat, hot mug of tea and a gazebo if it is raining.

 

Paint inside floor, replace all bushes with poly ones, all hoses replace with blue samco ones, tidy and paint engine bay, do a round head lamp conversion, fit quarter bumpers and cibies, spray underside of bonnet and do a mass sealant on the underside.

 

Shit man, looking at that list I am going to be bloody busy. Plan is to start Nov 1st and have done by 1st March.

 

leave the square headlights! 8)

Posted
Quite a bit hopefully if money and weather allows. Things cost so much now and I don't have a garage so I work outside with a thick coat, hot mug of tea and a gazebo if it is raining.

 

Paint inside floor, replace all bushes with poly ones, all hoses replace with blue samco ones, tidy and paint engine bay, do a round head lamp conversion, fit quarter bumpers and cibies, spray underside of bonnet and do a mass sealant on the underside.

 

Shit man, looking at that list I am going to be bloody busy. Plan is to start Nov 1st and have done by 1st March.

 

leave the square headlights! 8)

 

Nah go circular and upgrade to some good powerful halogens, always a bonus to see where you're going at night :shock:

Posted
selling the van is what iam going to be doing in the next few weeks ready for the next project :wink:

 

DON"T BELIEVE YA :!::!::!::D

Posted
selling the van is what iam going to be doing in the next few weeks ready for the next project :wink:

 

DON"T BELIEVE YA :!::!::!::D

 

m8 believe i love it to bits but every year i feel the need to move on :cry: but iam only 75% sure at the mo.

Posted

 

i found some small bubbles on my rear arch and on the c pillar so i might have the 1/4 replaced

 

 

how about guys?

 

Lunatic - got money to throw away have you Tom ? - no need to replace a 1/4 for small small rust - if you do I'll have your old one off you

:shock:

Posted

get mine welded up and mocked up and hopfully be in paint by xmas (am wishin :lol: ) and get out there and use the fooker nxt summer :ykt:

 

 

darren you know it makes sense south london look 8)8)

Posted

gearbox out sort out leaking rear crankshaft oil seal :(

 

change leaking diff pinion seal :(

 

then she wont leave 2 puddles of oil either end of the garage :sad:

 

change front legs to gaz fully Adjustable 8)

 

then save save save for a set of 17" image split rims :wink:

Posted

Big tunnel, T5 gearbox, 2.2 all steel bottom end, New manifold and system and Narrow Axle for the Van

Start work on the latest project to arrive in the Morley fleet :wink:

Cossy power for the Cortina :twisted:

Get RS2000 Painted :tits:

 

If only i had 5 minutes to myself! :roll:

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...